Friday, February 14, 2014

Commercial Lithonia Stair Stair Commercial Lighting Occupancy

Yolo County RFP
The desired occupancy date is 1 December 2010, building performance. LEED for New Construction and Major Renovations (LEED-NC) is designed for rating new and existing commercial and institutional buildings. Furnish and install Lithonia RT5 or approved equal fixtures throughout tenant ... Visit Document

Campus Views And ActivitiesCampus Views And Activities
• Accelerating adoption in campus & commercial buildings Bi-Level Stair Fixture – Reduces light when unoccupied. Available now Smart Switch and Fixture – LED nightlight, occupancy sensor; 45-70% energy savings. Available now ... View This Document

Www.dnr.state.oh.us
Commercial - Plan, designed, integrate, and installs of security and safety solutions for commercial Commercial, industrial, and institutional electrical contracting focusing on green energy (LED lighting, solar power, building automation, etc.). Services include energy management, fire ... Document Viewer

VA-248-11-IB-0108 VA-248-11-IB-0108_1.docx
Remove lighting and electrical work the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial Final inspection will not be made until the contract work is ready for beneficial use or occupancy. The contractor ... Get Content Here

Addendum No. 1
2. Note the 12” CMU wall, north side of stair S1, must remain for structural. Q. Remove restroom in commercial space. Rough-in for underground only. 1. Remove lighting fixture and occupancy sensor from restroom in Office-101 space. C. Drawing EL112 (reissued) ... Access Full Source


Remove and replace existing ceiling tile and 4" vinyl cove base.Remove the existing lighting fixtures and replace with 2'X2 (double switching) Lithonia Lighting. Remove and replace Bidders using commercial carrier services shall ensure that the bid is addressed and marked ... Retrieve Here

Draft PS&E SET
Sign letters shown on the plans shall be stenciled with commercial quality exterior black paint. Testing of paint will not be required. 16 INSTALLATION. Temporary concrete washout facilities shall be as follows: 1. ... Doc Viewer


Certificate of Occupancy. into mezzanine decks, decks above shop toilet rooms, enclosed shop offices, or similar structures. That portion of the stair which serves only the roof shall be a Provide complete high frequency commercial grade door hardware as required for function and ... Get Doc

Master 1 Specifications
Provide heavy-duty commercial-grade products. stair, entrance and exit/pathway doors, and where called for in the door schedule. Door Type Lock Type Hardware Group A. Storefront. 1. Lighting fixtures controlled by occupancy sensors shall have a wall-mounted, ... Fetch Document

Public Interest Energy Research
LED Occupancy Sensor and Bathroom Smart Fixture Solution: Working in close partnership with Lithonia Lighting, the CLTC is developing a lighting systems in commercial buildings. Th e specific hardware is designed to work with ... View Doc


1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 1Georgia Department of Community Affairs 1Office of Affordable Housing Arial Narrow,Regular" - Feb 2012 Arial Narrow,Regular" Arial,Regular" Arial Narrow,Regular" of ... Access This Document

Glengarda Child And Family Services Reno
Venience stair were installed. This day-lighting design combined with the use of high efficiency light Natural Resources Canada’s Commercial Building Incentive Program millwork uses Panval by Uniboard; lighting by Lithonia Lighting and Axis Lighting; plumbing by Zurn and American ... Get Content Here

CALIFORNIA PIER Demonstration Program ENERGY EFFICIENCY ...
LIGHTING HVAC/ENVELOPE T12 – T8, CFL Bi-level Stair Fixture, Motion-Sensing Wall Switch Personal Lighting System, Daylighting LED Ceiling Fan, Smart Outdoor • Lithonia: Commercial=CCR82 Residential=CCR62 • One ballast serves two lamp heads ... Fetch Here

Job Statistical Report - New York City
401 COMMERCIAL LP 401 1'-6" SPLAYS TO BE LOCATED AT 84.59' WEST OF THE INTERSECTION OF 169TH STREET AND LITHONIA AVENUE IN CONJUNCTION WITH DOB JOB. NO. 402488697. Modify entrance ramp and stair. No change in use egress or occupancy. No change to LL#5/73 compliance. 402497197 ... Return Document

FrtBoil
9.04 RUBBER STAIR TREADS 142. 9.05 PAINTING 142. DIVISION 10. SPECIALTIES 147. 16.04 LIGHTING 175. 16.05 INTRUSION ALARM SYSTEM 176 CS Commercial Standards (US Department of Commerce) ... Fetch This Document

Www.siordata.com
The stair and elevator towers adjacent to the office building will be finished in glass and masonry with upgraded ceiling finishes. Egress lighting and exit signs. Stair pressurization and smoke control fans. Lithonia Precise Series, ... View This Document

Www.dca.ga.gov
Development Budget for commercial component Instances of transient occupancy Addition or redesign of attractive stair/railings for new and existing buildings Major Building Component Materials and Upgrades Atlanta Fulton County Name ... Read Document

No comments:

Post a Comment